Total Cofigured Price: 185,000.00

Install one 200 amp 20 space overhead service panel include AFCI breakers as required for New ADU. To be spotted by SCE ..
If selected this price will be added to the total
Supply labor and material to install a Defiant motion sensor exterior flood light with wiring and switch at new ADU. $324 ea
If selected this price will be added to the total
Supply labor and material to install a Rheem Performance 36 kw Self-Modulating 7.03 GPM Tankless Electric Water Heater includes electrical circuit as required
If selected this price will be added to the total
Villa II Supply labor and material to paint exterior eaves and fascia and siding as specified
If selected this price will be added to the total
Villa II supply and material to install 40 lf of rain gutter and down spouts at exterior of roof area.
If selected this price will be added to the total
Supply labor and material to install a 21,000 2 zone 22 seer ductless Mr. Cool mini split at new ADU includes electrical disconnect
If selected this price will be added to the total

Total Cofigured Price: 185,000.00

Supply Labor And Material For Installation Of Single Piece 5/8" X 5 1/2"
If selected this price will be added to the total
Supply labor and material to install an Electric LED Fire and Ice wall mounted Fireplace $1200 ea
If selected this price will be added to the total
Supply labor and material to install Iron-away deluxe electric ironing board .
If selected this price will be added to the total
Supply labor and material to install 6" recessed lighting with color adjustment canless lights at new ADU 8 recessed lights $75.00 ea
If selected this price will be added to the total
Supply labor and material to install a Mewry integrated 52" LED light and fan with remote control at new ADU $325 ea.
If selected this price will be added to the total
Supply labor and material to install new 36" x 84" no panel Lincoln primed barn door with hardware kit $425 ea.
If selected this price will be added to the total
Supply labor and material to install a 25 " x 26" surface mount lighted medicine cabinet at bathroom includes electrical junction box as required
If selected this price will be added to the total
Supply labor material for a curbless ceramic tile shower approx 40" x 36" with a linner channel drain and shampoo box in new ADU .
If selected this price will be added to the total
Supply labor and material to frame in a 36" x 36" area for a stackable laundry room includes plumbing , drywall amd bifold doors .
If selected this price will be added to the total
Villa II Supply labor and material to apply PVA primer and 2 coats of Sherwin Williams Pro Mar 200 VOC interior latex paint at walls and ceilings of new ADU.
If selected this price will be added to the total

Total Cofigured Price: 185,000.00

Supply labor and material to install 12" x 24" x 36" Venato II porcelain subway tile in new Chateau ADU material allowance $2.50 per sqft. .
If selected this price will be added to the total
Supply labor and material to Install Life proof 22 mil sterling oak Luxury vinyl plank antibacterial, scratch-resistant, and waterproof flooring at Chateau ADU. $3.06 sqft
If selected this price will be added to the total
Supply labor and material to install 22 mil Curtis Lighthouse Malibu Luxury Vinyl Plank on material $3.62 sqft
If selected this price will be added to the total
Supply Labor And Material To Lay Traffic Master Dignafide Moder pile texture carpet with 5/16 foam padding at new ADU in bedroom and living room area $ 17 yd material
If selected this price will be added to the total
Supply labor and material to Install Life proof sterling oak Luxury vinyl plank antibacterial, scratch-resistant, and waterproof flooring at Chateau ADU. $3.06 sqft
If selected this price will be added to the total
Supply labor and material to install Traffic master Wonder plush polyester carpeting with 5/16 thick foam padding at new ADU $1.97 sqft
If selected this price will be added to the total

Total Cofigured Price: 185,000.00

install NGY or similar pre-fabricated medium grade 3/4" Quartz countertop
If selected this price will be added to the total
Supply Labor And Material To Install a GE over the range Microwave exhaust fan in new ADU.
If selected this price will be added to the total
Supply labor and material to install a Rangemaster Balista 6100 over the range stainless steel exhaust fan .
If selected this price will be added to the total
Supply labor and material to install Zella pearl opal ceramic subway tile for kitchen splash at the the ADU .
If selected this price will be added to the total

Total Cofigured Price: 185,000.00

Allowance of $6.00 per sqft for Permits and fees
If selected this price will be added to the total
Allowance of $8.00 sqft for solar panels
If selected this price will be added to the total

Total Cofigured Price: 185,000.00

Continue