The Villa model is a beautifully designed that comes in two sizes 600 and 800 sqft detached single story ADU that consist of 2 bedroom 1 bath a full kitchen and living room with optional laundry. This ADU includes dual glazed insulated windows, fully insulated walls and ceilings
The Villa I model is a beautifully designed 600 sqft detached single story ADU that consist of 2 bedroom 1 bath a full kitchen and living room with optional laundry. This ADU includes dual glazed insulated windows, fully insulated walls and ceilings, separate electrical Excludes , permits and fees, painting and floor coverings ,solar , separate meters , painting and floor covering , landscaping available as options.
The Villa II model is a beautifully designed 800 sqft detached single story ADU that consist of 3 bedroom 2 bath a full kitchen and living room with optional laundry. This ADU includes dual glazed insulated windows, fully insulated walls and ceilings, separate electrical pant. Excludes , permits and fees, painting and floor coverings ,solar , separate meters , painting and floor covering , landscaping available as options.
Pro Builders Express, Inc Date: Page: 01-Mar-24 Page 1 of 5
11408 Whittier Blvd ste B9 Whittier Ca 90605
(866)360-1526 Office
(562)921-5000 Fax
(562)921-5055
Customer Villa I Last Quote
Date 6/5/2023
CA By Bob Leon
Desc
Scope of Work
Supply
labor and material to build the Villa I
20 x 30 ft approximately 600 sqft
single story ADU
consisting of 2 bedrooms and 1 bath
# SPECIFICATIONS:
FOUNDATION/FOOTINGS
1 Excavate And
Finish A 12" X 18" Reinforced
Concrete Footing With Reiforcing Steel Tied And
Finished At Grade. Include Hold
downs , anchor bolts and 2500 PSI concrete .
100 lf.
2 Supply Labor
And Equipment For A Concrete Pump To Remote Location For Pumping Of Concrete As
Required. 1 Pump.
3 Pour A
31/2" 2500 Psi Reinforced Concrete Slab On Grade With Typical Excavation,2"
Slab Base ,Wire Mesh,Forms And 10 mil visqueen Vapor Barrier. "Contractor
Cannot Be Responsible For Minor Cracks In Concrete During The Curing Process."standard
installation for new room addition foundation . . 600 sqft.
FRAMING
4 Supply labor
and material to frame a 4 x 4 doug fir post for new construction as
required 8 ea.
5 Framing
Installation Of Pressure Treated 2" X 4" X10' Sill Plate Including
Drilled And Installed With Foundation Bolts. Sill
Plate Including Drilled And Installed With Foundation Bolts. 160 ft.
6 Frame
Interior And Exterior Walls With 2"X 4" Douglas Douglas Fir 16" On Center Interior And
Exterior Walls As Required.
7 Supply labor
and material to frame a window opening at new construction with proper size
header and kraft paper as specified. 7 openings.
8 Supply labor
and material to cut and hang 2"x6" doug fir ceiling or floor joist at
20" on center at new addition. 600
sqft.
9 Supply Labor
And Material For Cut And Stack Framing Of 2"X 12"X 20' Std & Btr
Studs With Roof Rafters Of 16" On Center For New Roof Area. 600 sqft.
10 Frame Up To
3' Door Opening In Wood Stud Wall With Appropriate Header . 5 ea.
11 Supply Labor
And Material To Frame Up To 8' bi-Pass Closet Door Opening In Wood Stud Wall
With Appropriate Header . 2 ea.
12 Supply Labor
And Material To Install 2" X 6" Rough Sawn Facia Along Edge Of Roof
Line For New Addition. 100 ft.
13 Supply labor
and material to install 5/8" cdx plywood sheating over new addition
include radiant barrier and simpson strapping
as specified .(Code Plus +)GREEN
BUILDING 600 sqft.
14 Supply Labor
And Material To Install 1" X 6" X 12'sel-J Grade Spf Pine Ship Lap
Roof Sheating At Perimeter Eve Of New Addition
. 100 lf.
Customers Initials Date
Pro Builders Express, Inc Date: Page: 01- FRAMING
15 Supply Labor
And Material To Install 4' X 10' X 1/2" Struct 1 Plywood Or Diagonal
Struts As Required At New Addition For Earthquake Shear Panel .(CODE PLUS)+ 600 sqft.
ROUGH PLUMBING
16 Supply labor
and material to install a 1/2 " vertical and 4/3 " horizonatal Pex or
copper hot and cold supply and 3" abs drain
waste with with cleanouts 10 ft tie in within foundation perimeter. 4 fixtures.
17 Supply Labor
And Material To Install Solvent Welded Abs 3" Drain Waste Line For Sewer
Lines As Required With Some trenching. 80 ft.
18 Supply Labor
And Material To Install 3/4" X 10' Sch 40 Black Pipe For Gas Line To Remote
Fixture Location In Wall includes
gas test excludes under concrete installation and meter relocation. 80 ft.
19 Supply Labor
And Material To Sweat Up To 20 Ft Of 1/2" Rigid Type M Copper Cold Supply
Tubing To Remote Valve
Location
With Hose Bib And Vacumn Breaker In Wall .
1 ea.
ROUGH ELECTRICAL
20 Supply Labor
And Material To Install Standard Grade 15a 125v 2 Pole 3 Wire Grounded White Or
Ivory Duplex Receptacle At New
Addition . 22 ea.
21 Install
Standard Grade White Or Ivory 15a/120v Quiet One Way 20 Amp Switches And Switch
Covers As Specified. 6 ea.
22 Supply Labor
And Material To Install Install Single Gang Box's,Square Or Round Boxes For
Outlet,Switch Or Light Receptacles
With 14/2 Type Nmb Romex Grounded Wiring At New Addition. 38 ea.
23 Installation
Of A Levitron Decorator Gfi 15a/125v Ivory Or White Gfi Receptacle Outlet
. 6 ea.
24 Supply Labor
And Material To Install A Leviton Exterior Gfi 20a/125v White Electrical Outlet
With A Plastic One Gang Decorator
Water Proof Cover . 1 ea.
25 Supply Labor
And Material To Install One 100 Amp Flush Mount Electrical Service Panel With
Circuit Breakers And Mast. Maximum
Run 15 Ft.Panel To Be Spotted By Southern California Edison.Includes Small
Junction Box. 1 panel.
26 Supply labor
and material to install a Pass & Seymour/Legrand White Wall Occupancy Sensor at new
addition 1 ea.
27 Supply labor
and material to add additional 120 volt circuit as required for new lighting
and power as required at new construction. 10 circuit.
28 Installation
Of dedicated Arc fault circuit breaker as required for bedrooms 15a/125v Ivory
Or White Gfi Receptacle Outlet 10 AFCI.
29 Supply Labor
And Material To Install 110 Volt Ac/Dc Hard Wired With Battery Backup Smoke
Detectors As Required For New
Bedrooms For Fire Code Requirements . 3
ea.
30 Install a
Carbon Monoxide Detector 85 decibel alarm Battery operated Permanent sensor
Test/reset button Updates every 15
secondsWith Digital Reading From 0-999 Ppm And Powerful 85 Decibal Alarm.
Required 1 ea.
ROOFING
31 Installaton
Of Hot Mop Rolled Roofing , To Include 1 Layer Of 30 # Base Sheet , 15 # Felt
With torch down dibeden , And 90
# Mineral Cap Sheet , Seal And Paint All Vent Pipes As Specified. 6 square.
Customers Initials Date
Pro Builders Express, Inc Date: Page: 01- INSULATION
32 Supply Labor
And Material To Install R-13 or R-15 as required Roxul wood unfaced batt
insulation 15" X 3 1/2" Batt Insulation
At Exterior Walls Of New Addition Includes Expanding Foam And Caulking As
Required t-24 green building.
800
sqft.
33 Supply Labor
And Material To Install R-30 or R-38 as required Roxul wood unfaced batt
insulationrt Therm 16" X 10 1/4" Batt Or
Roll Insulation At Ceilings Of New Addition
t-24 green building. 600 sqft.
HEATING
34 Supply Labor
And Material To Install A Williams or equal 30,000 Btu Single Wall Recessed Or
Surface Mount Gas Heater Matchless
Pilot Igniter Including Ventingb With A Built In Thermostat At New addition
. 1 ea.
DRYWALL
35 Supply Labor
And Material To Hang And Tape 1/2" Dry Wall On All Specified Walls And
Ceilings Of New Addition Includes Orange Peel Or Knockdown Texture. Smooth Wall
Texture Additional 2500 sqft.
FINISH CARPENTRY
36 Supply labor
and material to install a prehung Therma-Tru Benchmark Doors Rightor Left Hand
Inswing Fiberglass Entry Door
with Insulating Core at new addition . Excludes lockset . 1 ea.
37 Supply Labor
And Material To Install A JELD-WEN pre hung Colonist Primed 6-Panel Hollow Core
Molded Composite Single
Prehung Door right or left handed excludes lockset 3 ea.
38 Supply Labor
And Material To Install A ReliaBilt
60" White Chandler Bottom-Roll Interior Mirror Sliding Door
Mirrored Mirrored
Wardrobe Bi-Pass Door At New Addition .
2 ea.
39 Supply Labor
And Material To Install A Schlage Satin
Nickel Bed/Bath Door Knob Lockset At New
Door. 3 ea.
40 Supply Labor
And Material To Install A Kwikset Satin
Nickel Residential Entry Door Lever with Deadbolt entry lock At New Door.
1 ea.
41 Supply Labor
And Material For Installation Of Single Piece 3/8" X 2 1/4"
Streamline Primed Base Moulding Along Baseboard
Area. 220 ft.
42 Supply Labor
And Material For Installation Of 9/16"x 1 9/16" Primed MDF bevel Door Case Moulding At New
Addition .
130 ft.
43 Installation
Of Closet Shelf And Pole With 2" X 12" #2 pine closet shelf and pole
1 3/8" D.F. closet rod at closet interior. Pine And 1 3/8" D.F. Closet Rod. 20 ft.
WINDOWS
44 Supply labor
and material to install Pella Thermastar series nail on vinyl low E , dual
glaze argon gas insulated ,clear or obscure
glass nail on windows at new construction per building code, allowance of
$250.00 per window.Standard T-24 green
building.Limited lifetime warranty . 7
windows.
EXTERIOR FINISH
45 Supply Labor
And Material To Apply 3 Coat Stucco ,Scratch ,Brown And Colorcoat To Exterior
Walls And Ceilings In Textured
Or Sand Finish At New construction contractor Cannot Be Responsible For Minor
Cracks In Stucco During The Curing
Process or variations in stucco color from existing or color chip excludes foam
trims or psinting . 400 sqft.
46 Supply Labor
And Material To Install Paper Back Metal Lath Stapled Onto Frame To Prepare For
Scratch Coat at new construction. 400 sqft.
Customers Initials Date
Pro Builders Express, Inc Date: Page: 01-Mar-24 Page 4 of 5
11408 Whittier Blvd ste B9 Whittier Ca 90605
(866)360-1526 Office
(562)921-5000 Fax
(562)921-5055
EXTERIOR FINISH
47 Supply Labor
And Material for Installation of 8 1/4" x 12' Hardiplank proimed Cedarmill
fiber cement horizontal lap siding nailed
over building Paper with hardie trim as required at new construction.. 300 sqft.
48 Supply Labor
And Material For Installation Of 5/8" X 4' X 8' Premium T1-11 Southern
Yellow Pine Plywood Siding 4" Or 8" On Center Over Building Paper at new construction. 120 sqft.
BATHROOM FIXTURES
49 Supply Labor
And Material To Install A Style Selections Morriston White Single Sink Vanity
with White Engineered Stone Top
Bathroom Vanity At New Bathroom ADU 1
ea.
50 Supply Labor
And Material To Frame And Install Project Source 16-in x 26-in Rectangle
Surface/Recessed Mirrored Plastic Medicine
Cabinet 1 ea.
51 Supply Labor
And Material To Install A Pfister Masey 1-Handle Tub and Shower Faucet in
Brushed Nickel includes shower head
standard installation . 1 ea.
52 Supply Labor
And Material To Install a KOHLER Highline Classic White WaterSense Labeled
Elongated Chair Height 2-piece White Bathroom Toilet At New Bathroom ADU. 1 ea.
53 Supply Labor
And Material To Install A Delta Laurel High Gloss White Shower Wall Surround
Side and Back Wall Kitat new bathroom
Delta Laurel High Gloss White Acrylic Shower Base 1 ea.
54 Supply Labor
And Material To Install A 31 In. To 32-1/2 In. Opening Swinging Shower Door,
Sterling Plumbing Silver Frame
Obscure Glass Pivot Shower Door.Standard
1 ea.
55 Supply Labor
And Material To Install a Pfister Selia Brushed Nickel Single 24" Towel
Bar at bathroom 1 ea.
56 Supply Labor
And Material For Installation of Pfister Masey Brushed Nickel 2-handle
Widespread Bathroom Faucet at new ADU 1 ea.
57 Supply Labor
And Material To Install A Utilitech Ventilation Fan 2-Sone 70-CFM White
Bathroom Fan ENERGY STARWith 3"
Duct To Exterior Includes Switch a. For Baths Up To 65 Sqft. 1 ea.
FINISH ELECTRICAL
58 Supply Labor
And Material To Install A Project Source 2-Pack 7.4-in W White LED Flush Mount
Light ENERGY STAR Light Fixture
At New ADU. 5 ea.
59 Supply Labor
And Material To Install Portfolio 3-Light 23.5-in Weathered Bronze Vanity
Light at bathroom addition excludes
glass shades . 1 ea.
60 Supply
Material And Labor To Install A Secure Home 9.52-in H Matte Black Motion
Activated Outdoor Wall Light At New ADU. 1 ea.
KITCHEN FIXTURES
61 Supply labor
and material to install one 1/2" supply line and 1/4" supply for
refrigerator ice maker with supply valve
and filter
. 1 supply line.
62 Supply Labor
And Material For Installation Of he Wintucket collection offers a popular
neutral tone and durable Cloud finish
that is perfect any transitional kitchen excludes Optional Door Pulls,Knobs,Interior
Accessories.$4,950.00_ Allowance
for cabinets . Lowes, Home depot , NGY etc
45 lf.
63 Supply Labor
And Material To Install A Moen Renzo
Black Pull-out Kitchen Faucet With Flex Supply Lines.Standard installation 1 ea.
Customers Initials Date
Pro Builders Express, Inc Date: Page: 01-
KITCHEN FIXTURES
64 Supply Labor
And Material To Install A Elkay
Double-Basin Stainless Steel Undermount Kitchen Sink Kitchen Sink With Flex
Supply Lines And Drain As Specified. Standard installation nickel design
series 1 ea.
65 Supply Labor
and material to install owner supplied appliances for new kitchen to include
standard Dishwasher, Oven, Stove
as required 4 appliances .Custom appliances installation additional cost 4
appliance.
66 Supply Labor
And Material To Install A Nutone 30" WhiteWhispair decorator 210 Cfm Range
Hood Kitchen Exhaust Fan As Specified With 6 Inch Vent Ducting Through
Wall Or Roof. Standard installation 1
ea.
67 Supply Labor
And Material To Install A In Sink Erator 1/3 Hp Badger1 Garbage Disposal At
Kitchen Area 1 Year Warranty. 1 ea.
68 Supply Labor
and material to install NGY or similar pre-fabricated medium grade
3/4" Quartz countertop cut to size
with square
edges over rough top with a 6" splash allowance of $200 per 9 ft section
standard installation. 35 sf.
PERMITS/PLANS/MISC.
69 This estimate
good for 45 days from origional date , contracts after this date are required
to be approved by Pro Builders Express
Inc. 1 .
70 Design And
Preparation Of Building Plans For Single Story Or Remodel And Submital To
Building Department excludes planning
review requirements 600 per sqft.
71 Removal And
Dumping Of Approximately 40 Cuyds Of Construction Debris Per Load Excludes
recycling fees if required bycity 50 % recycled,Green Building . 15 loads.
72 Supply labor
to load and haul away excess fill dirt or concrete from foundation . Includes 1
low boy . 3 load.
73 Homeowner to
choose all material, fixture and color choices before project walk thru and
start of project. 1 choice.
74 These items
are specifically excluded from this estimate , other may also be excluded :
permits,solar , engineering , paint , floor coverings , separate meters 1 Total.
This is a
quotation based on Customer Specifications and by itself is not a contract to
do Work.
Pro-Builders
Express cannot be responsible for changes in Work or Price due to County, State
or
Federal
Building Requirements that were not Specified nor Based on Approved Plans.
Items noted
as standard are subject to additional charge
if changed to a custom installation by owner.
Grand Total w/tax: $157,620.57
______________________________ ____________
___________________________________
Customer
Signature
Date
Pro-Builders Express Date
MUST BE
SIGNED AND DATED ALONG WITH CONTRACT TO BECOME VALID.
Customers Initials Date
Pro Builders Express, Inc Date: Page:
(866)360-1526 Office
(562)921-5000 Fax
Date 7/23/2023
CA By Bob Leon
Desc
Scope of Work
The
Villa II 800 sqft ADU 3 bedroom 2 bath slab on grade , composition roof per
pre-designed plans note exclusions below .
SPECIFICATIONS:
FOUNDATION/FOOTINGS
1 Excavate And
Finish A 24" X 12" Reinforced Concrete Footing With Reiforcing Steel
Tied And Finished At Grade. Include Hold
downs , anchor bolts and 2500 PSI concrete .
120 ft.
2 Supply Labor
And Equipment For A Concrete Pump To Remote Location For Pumping Of Concrete As
Required. 1 Pump.
3 Pour A
3" 2500 Psi Reinforced Concrete Slab On Grade With Typical Excavation,Slab
Base,And Forms. "Contractor Cannot Be Responsible For Minor Cracks In Concrete
During The Curing Process."standard installation . 50 sqft.
4 Pour A
31/2" 2500 Psi Reinforced Concrete Slab On Grade With Typical
Excavation,2" Slab Base ,Wire Mesh,Forms And 10 mil visqueen Vapor Barrier. "Contractor
Cannot Be Responsible For Minor Cracks In Concrete During The Curing Process."standard
installation for new ADU foundation . .
800 sqft.
FRAMING
5 Framing
Installation Of Pressure Treated 2" X 4" X10' Sill Plate Including
Drilled And Installed With Foundation Bolts. Sill
Plate Including Drilled And Installed With Foundation Bolts. 200 ft.
6 Frame
Interior And Exterior Walls With 2"X 4" Douglas Douglas Fir 16" On Center Interior And
Exterior Walls As Required.
7 Supply labor
and material to frame a window opening at new construction with proper size
header and kraft paper as specified. 10 openings.
8 Supply labor
and material to cut and hang 2"x6" doug fir ceiling or floor joist at
24" on center at new ADU. 800
sqft.
9 Supply Labor
And Material For Cut And Stack Framing Of 2"X 12"X 20' Std & Btr
Studs With Roof Rafters Of 16" On Center For New Roof Area. 800 sqft.
10 Frame Up To
3' Door Opening In Wood Stud Wall With Appropriate Header . 6 ea.
11 Supply Labor
And Material To Frame Up To 8' bi-Pass Closet Door Opening In Wood Stud Wall
With Appropriate Header . 3 ea.
12 Supply labor
and material to install 5/8" cdx plywood sheating over new ADU include
radiant barrier and simpson strapping
as specified .(Code Plus +)GREEN
BUILDING 800 sqft.
13 Supply Labor
And Material To Install 4' X 10' X 1/2" Struct 1 Plywood Or Diagonal
Struts As Required At New Addition For Earthquake Shear Panel .(CODE PLUS)+ 960 sqft. Customers Initials Date
Pro Builders Express, (866)360-1526 Office
(562)921-5000
ROUGH PLUMBING
14 Supply labor
and material to install a 1/2 " vertical and 4/3 " horizonatal Pex or
copper hot and cold supply and 3" abs
drain
waste with with cleanouts 10 ft tie in within foundation perimeter. 7 fixtures.
15 Supply Labor
And Material To Install 3/4" X 10' Sch 40 Black Pipe For Gas Line To
Remote Fixture Location In Wall
includes
gas test excludes under concrete installation and meter relocation. 60 ft.
16 Supply Labor
And Material To Sweat Up To 20 Ft Of 1/2" Rigid Type M Copper Cold Supply
Tubing To Remote Valve
Location
With Hose Bib And Vacumn Breaker In Wall .
1 ea.
ROUGH ELECTRICAL
17 Supply Labor
And Material To Install Standard Grade 15a 125v 2 Pole 3 Wire Grounded White Or
Ivory Duplex Receptacle At New
ADU. 33 ea.
18 Install
Standard Grade White Or Ivory 15a/120v Quiet One Way 20 Amp Switches And Switch
Covers As Specified. 6 ea.
19 Supply Labor
And Material To Install Install Single Gang Box's,Square Or Round Boxes For
Outlet,Switch Or Light Receptacles
With 14/2 Type Nmb Romex Grounded Wiring At New ADU. 40 ea.
20 Installation
Of A Levitron Decorator Gfi 15a/125v Ivory Or White Gfi Receptacle Outlet
. 8 ea.
21 Supply Labor
And Material To Install A Leviton Exterior Gfi 20a/125v White Electrical Outlet
With A Plastic One Gang Decorator
Water Proof Cover . 1 ea.
22 Supply Labor
And Material To Install One 100 Amp Flush Mount Electrical Service Panel With
Circuit Breakers And Mast. Maximum
Run 15 Ft.Panel To Be Spotted By Southern California Edison.Includes Small
Junction Box. 1 panel.
23 Supply labor
and material to install a Pass & Seymour/Legrand White Wall Occupancy Sensor at new ADU 2 ea.
24 Supply labor
and material to add additional 120 volt circuit as required for new lighting
and power as required at new construction. 15 circuit.
25 Installation
Of dedicated Arc fault circuit breaker as required for bedrooms 15a/125v Ivory
Or White Gfi Receptacle Outlet . 15 AFCI.
26 Supply Labor
And Material To Install 110 Volt Ac/Dc Hard Wired With Battery Backup Smoke
Detectors As Required For New
Bedrooms For Fire Code Requirements . 4
ea.
27 Install a
Carbon Monoxide Detector 85 decibel alarm Battery operated Permanent sensor
Test/reset button Updates every 15
secondsWith Digital Reading From 0-999 Ppm And Powerful 85 Decibal Alarm.
Required 1 ea.
ROOFING
28 Installaton
Of Hot Mop Rolled Roofing , To Include 1 Layer Of 30 # Base Sheet , 15 # Felt
With torch down dibeden , And 90
# Mineral Cap Sheet , Seal And Paint All Vent Pipes As Specified. 8 square.
INSULATION
29 Supply Labor
And Material To Install R-13 or R-15 as required Roxul wood unfaced batt
insulation 15" X 3 1/2" Batt
Insulation
At Exterior Walls Of New Addition Includes Expanding Foam And Caulking As
Required t-24 green building.
960
sqft.
30 Supply Labor
And Material To Install R-30 or R-38 as required Roxul wood unfaced batt
insulationrt Therm 16" X 10 1/4"
Batt Or
Roll Insulation At Ceilings Of New Addition
t-24 green building. 800 sqft.
Customers Initials Date
Pro Builders Express, Inc Date: Page: 03-Mar-24 Page 3 of 5
11408 Whittier Blvd ste B9 Whittier Ca 90605
(866)360-1526 Office
(562)921-5000 Fax
(562)921-5055
HEATING
31 Installation
of a 20 amp dedicated circuitfor for FAU with light and switch . 1 Fau circuit.
32 Installation
of a 220 volt dedicated circuitt for A/C with service disconnect as
required. 2 disconnet.
33 Supply labor
and material to install a LG or equal
mini split 32000 BTU heating air system at new addition includes wall
installation
and exterior compressor unit. 1 ea.
DRYWALL
34 Supply Labor
And Material To Hang And Tape 1/2" Dry Wall On All Specified Walls And
Ceilings Of New Addition Includes
Orange Peel Or Knockdown Texture. Smooth Wall
Texture Additional 3040 sqft.
FINISH CARPENTRY
35 Supply labor
and material to install a prehung Therma-Tru Benchmark Doors Rightor Left Hand
Inswing Fiberglass Entry
Door
with Insulating Core at new addition . Excludes lockset . 1 ea.
36 Supply Labor
And Material To Install A JELD-WEN pre hung Colonist Primed 6-Panel Hollow Core
Molded Composite
Single
Prehung Door right or left handed excludes lockset 6 ea.
37 Supply Labor
And Material To Install A ReliaBilt
60" White Chandler Bottom-Roll Interior Mirror Sliding Door
Mirrored
Mirrored
Wardrobe Bi-Pass Door At New Addition .
3 ea.
38 Supply Labor
And Material To Install A Schlage Satin
Nickel Bed/Bath Door Knob Lockset At New
Door. 6 ea.
39 Supply Labor
And Material For Installation Of Single Piece 3/8" X 2 1/4"
Streamline Primed Base Moulding Along
Baseboard
Area. 240 ft.
40 Supply Labor
And Material For Installation Of 9/16"x 1 9/16" Primed MDF bevel Door Case Moulding At New
ADU . 222
41 Installation
Of Closet Shelf And Pole With 2" X 12" #2 pine closet shelf and pole
1 3/8" D.F. closet rod at closet interior.
Pine And 1 3/8" D.F. Closet Rod. 30 ft.
WINDOWS
42 Supply labor
and material to install Pella Thermastar series nail on vinyl low E , dual
glaze argon gas insulated ,clear or
obscure
glass nail on windows at new construction per building code, allowance of
$250.00 per window.Standard T-24
green
building.Limited lifetime warranty . 10
windows.
EXTERIOR FINISH
43 Supply Labor
And Material To Apply 3 Coat Stucco ,Scratch ,Brown And Colorcoat To Exterior
Walls And Ceilings In
Textured
Or Sand Finish At New construction contractor Cannot Be Responsible For Minor
Cracks In Stucco During The
Curing
Process or variations in stucco color from existing or color chip excludes foam
trims or psinting . 800 sqft.
44 Supply Labor
And Material To Install Paper Back Metal Lath Stapled Onto Frame To Prepare For
Scratch Coat at new
construction. 800 sqft.
45 Supply Labor
And Material for Installation of 8 1/4" x 12' Hardiplank proimed Cedarmill
fiber cement horizontal lap siding
nailed
over building Paper with hardie trim as required at new construction.. 240 sqft.
BATHROOM FIXTURES
46 Supply Labor
And Material To Install A Style Selections Morriston White Single Sink Vanity
with White Engineered Stone
Top
Bathroom Vanity At New Bathroom ADU. 2
ea.
47 Supply Labor
And Material To Frame And Install Project Source 16-in x 26-in Rectangle
Surface/Recessed Mirrored Plastic
Medicine
Cabinet 2 ea.
Customers Initials Date
Pro Builders Express, Inc Date: Page: 03-Mar-24 Page 4 of 5
11408 Whittier Blvd ste B9 Whittier Ca 90605
(866)360-1526 Office
(562)921-5000 Fax
(562)921-5055
BATHROOM FIXTURES
48 Supply Labor
And Material To Install A Pfister Masey 1-Handle Tub and Shower Faucet in
Brushed Nickel includes shower
head
standard installation . 2 ea.
49 Supply labor
and material to install KOHLER Verticyl White Undermount Rectangular Bathroom
Sink with Overflow sink at
bathroom
2 sink.
50 Supply Labor
And Material To Install a KOHLER Highline Classic White WaterSense Labeled
Elongated Chair Height 2-piece
White Bathroom Toilet At New Bathroom
ADU. 2 ea.
51 Supply Labor
And Material To Install A Delta Laurel High Gloss White Shower Wall Surround
Side and Back Wall Kitat new
bathroom
Delta Laurel High Gloss White Acrylic Shower Base 2 ea.
52 Supply Labor
And Material To Install A 31 In. To 32-1/2 In. Opening Swinging Shower Door,
Sterling Plumbing Silver
Frame
Obscure Glass Pivot Shower Door.Standard
2 ea.
53 Supply Labor
And Material To Install a Pfister Selia Brushed Nickel Single 24" Towel
Bar at bathroom 2 ea.
54 Supply Labor
And Material For Installation of Pfister Masey Brushed Nickel 2-handle
Widespread Bathroom Faucet at new
addition 2 ea.
55 Supply Labor
And Material To Install A Utilitech Ventilation Fan 2-Sone 70-CFM White
Bathroom Fan ENERGY STARWith
3"
Duct To Exterior Includes Switch a. For Baths Up To 65 Sqft. 2 ea.
FINISH ELECTRICAL
56 Supply Labor
And Material To Install A Project Source 2-Pack 7.4-in W White LED Flush Mount
Light ENERGY STAR Light
Fixture
At New Addition. 3 ea.
57 Supply Labor
And Material To Install Portfolio 3-Light 23.5-in Weathered Bronze Vanity
Light at bathroom addition
excludes
glass shades . 2 ea.
58 Supply
Material And Labor To Install A Secure Home 9.52-in H Matte Black Motion
Activated Outdoor Wall Light At New
ADU. 1 ea.
KITCHEN FIXTURES
59 Supply labor
and material to install one 1/2" supply line and 1/4" supply for
refrigerator ice maker with supply valve
and
filter
. 1 supply line.
60 Supply Labor
And Material For Installation Of custom kitchen cabinets As Specified .Excludes Optional Door
Pulls,Knobs,Crown
Moulding And Interior
Accessories.$5,850.00 Allowance for cabinets labor and material . 30 lf.
61 Supply Labor
And Material To Install A Moen Renzo
Black Pull-out Kitchen Faucet With Flex Supply Lines.Standard
installation 1 ea.
62 Supply Labor
And Material To Install A Elkay
Double-Basin Stainless Steel Undermount Kitchen Sink Kitchen Sink With
Flex
Supply Lines And Drain As Specified. Standard installation nickel design
series 1 ea.
63 Supply Labor
and material to install owner supplied appliances for new kitchen to include
standard Dishwasher, Oven,
Stove
as required 4 appliances .Custom appliances installation additional cost 1 4
appliance.
64 Supply Labor
And Material To Install A Nutone 30" WhiteWhispair decorator 210 Cfm Range
Hood Kitchen Exhaust Fan As
Specified With 6 Inch Vent Ducting Through
Wall Or Roof. Standard installation 1
ea.
65 Supply Labor
And Material To Install A In Sink Erator 1/3 Hp Badger1 Garbage Disposal At
Kitchen Area 1 Year Warranty.
1 ea.
Customers Initials Date
Pro Builders Express, Inc Date: Page: 03-Mar-24 Page 5 of 5
11408 Whittier Blvd ste B9 Whittier Ca 90605
(866)360-1526 Office
(562)921-5000 Fax
(562)921-5055
KITCHEN FIXTURES
66 Supply Labor
and material to install NGY or similar pre-fabricated medium grade
3/4" Quartz countertop cut to size
with
square
edges over rough top with a 6" splash allowance of $200 per 9 ft section
standard installation. 45 sf.
PERMITS/PLANS/MISC.
67 This estimate
good for 45 days from origional date , contracts after this date are required
to be approved by Pro Builders
Express
Inc. 1 .
68 Design And
Preparation Of Building Plans For Single Story Or Remodel And Submital To
Building Department excludes
planning
review requirements 700 per sqft.
69 Removal And
Dumping Of Approximately 40 Cuyds Of Construction Debris Per Load Excludes
recycling fees if required by
city 50 % recycled,Green Building . 16 loads.
70 Customer to
relocate existing sprinkler system as required for construction of new
ADU. .
1 .
71 Homeowner to
choose all material, fixture and color choices before project walk thru and
start of project. 1 choice.
72 These items
are specifically excluded from this estimate , other may also be excluded :
permits , fees , solar , painting,
flooring
, separate meters. 1 Total.
This is a
quotation based on Customer Specifications and by itself is not a contract to
do Work.
Pro-Builders
Express cannot be responsible for changes in Work or Price due to County, State
or
Federal
Building Requirements that were not Specified nor Based on Approved Plans.
Items noted
as standard are subject to additional charge
if changed to a custom installation by owner.
Grand Total w/tax: $218,159.88
______________________________ ____________
___________________________________
Customer
Signature
Date
Pro-Builders Express Date
MUST BE
SIGNED AND DATED ALONG WITH CONTRACT TO BECOME VALID.
Customers Initials Date